Matthew M. McGrath Summary: Buena Park,
CA War Room
Project Manager/ Field
Coordinator Direct
and maintain schedule with subcontractors in performing troubleshooting
activities as requested by the client on Ericsson LTE, UMTS, GSM Models 6601,
2206, 3206 Macro, 2308, 3208 Micro, Small Cell and MobileAccess iDAS Systems. Interface
directly with AT&T Mobility Control Center providing schedule and status
of troubleshooting activities. Ordering material. Completing change
order request to General Contractors for non-warranty site work. Submitting
work orders to the client for authorization. Field visits to perform safety
assessment and promote quality installations. Direct
subcontractors in performing civil work to allow for modification on site
builds for at&t Mobility in Southern California. Direct the
de-commissioning of Ericsson 2206 GSM macro equipment. Perform
pre-construction and post construction site walks, coordinate with vendor and
site owners, site access engineering and delivery issues, present on site for
equipment cuts, work closely with vendor on logistic issues for new Ericsson
UMTS and LTE equipment installation, site qualification meetings, record data
for out of scope items to recover costs. Coordinate heavy equipment including
reach forks, cranes and Manlifts to install/de-install equipment. Document
with photographs, all work ongoing at sites and ensure quality and safety,
perform safety assessments, review and approve closeout packages which
include site photographs, redlined as built drawings, ground tests as well as
other pertinent documents. 10/2009 – 02/2010Bechtel
Communications, Inc. Oklahoma City, OK Direct subcontractors in performing Civil work to
allow for new site builds for Cox Communications in Oklahoma City, OK,
perform pre-construction and post construction walks, coordinate with vendor
and site owners, site access engineering and delivery issues, present on site
for equipment cuts, work closely with vendor on logistic issues for new
Huawei equipment installation, site qualification meetings, record data for
out of scope items to recover costs, document with photographs, all work
ongoing at sites and ensure quality, review and approve closeout packages
which include site photographs, redlined as built drawings, ground tests as
well as other pertinent documents. 03/2009 –
08/2009 Vantage Company a division of W CorporationSanta
Ana, CA Performed site walks in LA/Orange County and Inland
Empire areas for T-Mobile Fiber project. Submitted power point presentations
with photos of each site to client for review and final design. Coordinated
equipment distribution for 2 different vendors and 9 different General
Contractors. Worked with GC’s on remote sites to verify conduit paths from
handoff point to the sites.
Direct subcontractors in performing work to allow for
the equipment change out at multiple sites simultaneously in West LA and the
Inland Empire, perform pre-construction and post construction walks,
coordinate with at&t mobility, site access engineering and delivery
issues, present on site for equipment cuts, work closely with vendor on
logistic issues for equipment swap out, site qualification meetings, record
data for out of scope items to recover costs. Direct the de-commissioning of
Ericsson TDMA macro equipment. Document with photographs, all work ongoing at
sites and ensure quality, review and approve closeout packages which
include site photographs, redlined as built drawings, sweep tests as well as
other pertinent documents. 12/2004 – 04/2005 Bechtel
Telecommunications Corp.Cerritos, CA Completed pertinent information (RF data sheet,
electrical power, T1 and other specific site requirements) that is sent to
the A&Es for the creation of Zoning and Construction Drawings for
Cingular's new build sites, worked directly with site acq on site
identification and due diligence necessary to complete site candidate
packages for new capacity and in-fill sites in Los Angeles metro area,
reviewed the approved construction drawings prior to issuing for construction
for client’s new build sites, Managed 3 A&E firms simultaneously,
performed site walks to determine site design, review and approval of Site
Acquisition and RF design packages prior to zoning drawings, lease exhibits,
and detailed construction permit drawings for construction of client’s new
build sites.
Completed assignment as technical engineering
consultant for a multi-phase project in a joint effort to research, document
and formulate an automated transport database for the routing information,
DACS, MUX, ATM and switch equipment configuration; and provisioning of all
AT&T and Leased customer DS-0, DS-1, DS-3, OC-3, OC-12, and OC-48
circuits in the following markets: Denver, CO., Omaha, NE. Albuquerque, and
Santa Fe, NM., El Paso, TX., NY Metro including NJ and CT, Commissioning of
In-Building LGC Wireless Cellular DAS, Distributed antenna Systems and PCS
Systems, RF layout and system Integration, Site planning and training.
Installed and Integrated Hughes AIReach™ Office DAS,
Distributed Antenna Systems 850 MHz and 1900 MHz Cellular equipment,
Installed and configured Cisco and Bay Networks routers, Generated Status
reports, maintained systems and interfaced directly with customers,
installed, integrated and coordinated troubleshooting of Cellular Digital
Packet Data (CDPD) equipment for GTE Mobilnet and Bell Atlantic Mobile,
performed site surveys to determine equipment location, and specific
requirements, single Point of Contact in charge of installation crews,
Customer Liaison in Markets throughout the US and Canada, Integrated live
CDPD systems at CTIA from 1995 to 2000, Installation of Hughes Cell site
Automated Test Tool Controller (CAT) and associated equipment, Installed,
Commissioned and Coordinated Troubleshooting of TDMA cellular equipment,
throughout the Southern US, Knowledge of various types of test equipment
including, Hewlett Packard Cell Site Test Set Model HP 8921A and TTC T-Berd
224 T-1 Test set.
|
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |